Friday 9 April 2010

Hunter station stages


The different stages of the Hunter boat as it docks into the building. It arrives into its final position upside down so that the Iguana can be extracted an put onto the carcass rail. The safety cage allows it to be stunned without risk of the worker being attacked.

Here is a detail of the Hunter boat as it is lifted from the water. You can see this in the image above in the first stage on the left.

A close up of the final stage in the iguana extraction.

No comments:

Post a Comment